S-753 Battery Energy Storage Systems (BESS) (IEC) specification documents launched for public review
IOGP-JIP33 has issued the S-753 – Battery Energy Storage Systems (BESS) (IEC) specification documents for public review. The consultation period runs for 4 weeks and will close on Friday 7th February 2025 at 23:00 GMT.
The purpose of the IOGP S-753 specification documents is to define a minimum common set of requirements for the procurement of battery energy storage systems (BESSs) in accordance with IEC TS 62933-3-1, Edition 1.0 2018-08 Electrical energy storage (EES) systems – Part 3-1: Planning and performance assessment of electrical energy storage systems – General specification, for application in the petroleum and natural gas industries.
The IOGP S-753 specification documents follow a common structure comprising a specification, also known as a technical requirements specification (TRS), a procurement data sheet (PDS), an information requirements specification (IRS) and a quality requirements specification (QRS). These four specification documents, together with the purchase order, define the overall technical specification for procurement.
Draft revisions of the specifications are made available on this site for a 4 week duration for public review and comment.
Please download and read the instructions for providing feedback. Download instructions.
Feedback is strongly preferred within the digital specification development tool Jama Connect to allow more efficient compilation and response to comments. Please email feedback@jip33.org for access to the tool including details of the specification you would like to comment on.
Operator staff should contact the SC representative to feed their comments back through their SME.
If returning comments via the digital tool is not possible, please download the document and mark up your comments. Submit the marked up file to feedback@jip33.org
** If you have problems downloading the specs, either open in Chrome or Microsoft Edge. If this does not work, right click on the document ‘download’ you are trying to download, copy the link, paste in a new tab, and it should download without any issues.
The closing date for comments is Friday 7th February 2025 at 23:00 GMT.
Name | Jama Access | Download document |
S-753 – Supplementary Specification to IEC TS 62933-3-1 for Battery Energy Storage Systems (BESS) (TRS) | Jama Access | Download |
S-753 – Quality Requirements for Battery Energy Storage Systems (BESS) (IEC) (QRS) | Jama Access | Download |
S-753 – Information Requirements for Battery Energy Storage Systems (BESS) (IEC) (IRS) ** | Jama Access | Download |
S-753 – Procurement Data Sheet for Battery Energy Storage Systems (BESS) (IEC) (PDS) ** | Jama Access | Download |
S-753 – Supplementary Specification to IEC TS 62933-3-1 for Battery Energy Storage Systems (BESS) (TRS) with Justifications | Not applicable | Download |